• Brass Dynamic Balancing Valve for Heating and Cooling Systems
  • Brass Dynamic Balancing Valve for Heating and Cooling Systems

Brass Dynamic Balancing Valve for Heating and Cooling Systems

After-sales Service: 24hours
Warranty: 12 Months
Type: Chiller
Air Tube Material: Galvanized Sheet
Corrosion Durability: General
Operating Voltage: 220V
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2007

Suppliers with verified business licenses

Zhejiang, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
OEM Services
The supplier provides OEM services for popular brands
Quality Assurance
The supplier provides quality assurance
to see all verified strength labels (18)

Basic Info.

Model NO.
DR159
Noise Level
Low
Application Fields
Food Processing
Mounting
Wall/Window Mount
Lifetime
5~10 years
Certification
RoHS
Condition
New
Handle Sleeve
Blue/Red/Yellow, Any Color
Field
Heating & Air Conditioning System
Treatment
Sand Blast
Service
OEM, ODM
Transport Package
Inner Plastic Bag/Carton/ Plywood Pallet
Specification
1/4"-4"
Trademark
D&R
Origin
Zhejiang, China
HS Code
8481804090
Production Capacity
100000/Month

Product Description

D&R PICV Dynamic Balancing Valve is suitable for heating and air conditioning systems. 

NINGBO D&R METAL INDUSTRIES CO., LTD. has been engaged in the production and export of hardware industry for more than 18 years. Markets cover the North America, South America, Europe, Southeast Asia, Central Asia and other regions, and own offices in Iran, Turkey and Kazakhstan. Many our regular customers have been cooperated with us over 10 years due to our strength in R&D and professional engineers, technician and sales team in the valves and fittings area. Our main products include brass, and stainless steel ball valve, gate valve, stop valve, check valve, filter, float valve, angle valve, bibcock, metal parts, and we also do OEM/ODM service.

WHY CHOOSE US ?
1. Direct Factory-- No extra cost and more flexible in OEM/ODM.
2. Concentrated-- Focus on making brass valves. Including ball, gate, check, stop, angle valves. 
3. Professional--Advanced machines+Experienced R&D team+Qualified QCs+Reliable Aftersales.
4. Value-added Service--Free Industrial recommendations based on customer's demand; free samples; 7x24h quick reply; Delivery time no more than 30 days.  

Product Attributes
Item Name.:  PICV Dynamic Balancing Valve
Item No.:  DR 9003
valve type:  PICV ( FCU, heating and air conditioning system)
Body material:  Brass
Connection end:  G Thread
Size:  3/4''--1'' (DN20- DN25)
Nominal pressure:  2.0 MPa
Working Temperature:  -10ºC≤t≤120ºC
Connection way:  female thread
Cylindrical pipe thread  comply with ISO230,NPT,BSP
Medium:  Water, non-corrosive liquid, saturated steam(≤0.6MPa)

PRODUCT IMAGE
Brass Dynamic Balancing Valve for Heating and Cooling SystemsBrass Dynamic Balancing Valve for Heating and Cooling SystemsBrass Dynamic Balancing Valve for Heating and Cooling Systems


PACKAGE & DELIVERY
Brass Dynamic Balancing Valve for Heating and Cooling Systems



FAQ
Q1: Are you factory?

A1: Yes, we are professional manufacturer for brass fittings and valves.

Q2: Can I have a sample order for valve?
A2: 1pc for sample checking is available. For stocks, low MOQ is available.

Q3: How can I get the sample to check your quality?
A3: After price confirmation, you can require for samples to check our product's quality.

Q4: How to proceed an order for valve?
A4: Firstly let us know your requirements or application. 
      Secondly we quote according to your requirements or our suggestions. 
      Thirdly customer confirms the samples and places deposit for formal order. 
      Finally we arrange the production


Q5: What about the lead time?
A5: Existing sample needs 3-7 days, new sample 35 days, mass production takes 30-45 days.

Q6: How do you ship the goods and how long does it take to arrive?
A6: We usually ship by sea. It usually takes 30 days to arrive. Air shipping also is optional.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now